PROJECTS
|
Client |
Roles |
Description |
|
QR
|
Senior Project Manager Senior Project Engineer |
Produce a comprehensive Scope of Works and Technical Criteria (SWTC) to provide the technical brief and specification and specify the minimum mandatory requirements for design of the rail component of the project as an input to the dual ECI process and the eventual D&C contract. Provide technical expertise to Queensland Rail project team during the selection of the ECI proponents. |
|
DEEDI |
Senior Design Manager Project Engineer |
CPM has provided strategic project management to manage, lead and support delivery of three projects: the Aldoga North Access Road; Gladstone Services Corridor; and Collingwood Park Mine Remediation Projects. These projects are the responsibility of the Infrastructure Projects (IP) Division in the Office of the Coordinator General – the Department of Employment, Economic Development and Innovation (DEEDI). |
|
Ausenco Taggart JV - South Gobi Sands Project, Mongolia |
Senior Project Engineers | CPM Project Engineers were responsible for scoping, tendering and contract management of all construction contract packages. The Management of wet infrastructure design packages with local Mongolian companies. High level reviews of wet infrastructure designs including water and waste water reticulation. Implementation of management systems including, drawings control, technical queries, for the project due to its specific needs as a project in a remote location. Read More» |
|
SeqWater |
Project Manager | Project management for SeqWaters programme of small capital works including civil, mechanical and electrical components on multiple assets across SE Qld. Including scope of works development, procurement of suitable contractors to deliver the works and on-site management of all facets of these projects to through to completion and handover to SeqWater Operations. Read More » |
| Qld Main Roads | Project Manager | Advising on an innovative procurement method to respond to the expected construction boom in SE Qld. |
| Qld Main Roads | Contractor submission review | Providing independent review of contractor submitted management plans |
| ARRP Bridge Alliance | Alliance Project Manager | Management during the IPAA phase |
| Toowoomba Pipeline Alliance |
Alliance Construction Manager Senior Project Engineer Scheduler Systems Manager Commissioning Engineer |
CPM provided management during the Construction phase of the project. |
| Thiess QCLNG |
Project Manager Engineer Scheduler |
Claims Management Management of site preparation works Develop and maintain construction programme |
| Thiess NSW |
Project Manager Engineer |
Tintenbar to Ewingsdale Upgrade Project |
| John Holland Group | Project Engineer | CPM provided Engineering support to the Hay Point Coal Terminal Upgrade Bid. CPM was responsible for the overall logistics plan in order to support works on various ports, harbours and laydown areas. |
| Baulderstone | PUP Manager | Design development, planning and Service Authority liaison for a major Qld Main Roads Project |